| Management number | 231069253 | Release Date | 2026/06/18 | List Price | $16.00 | Model Number | 231069253 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
This advanced pet tracker utilizes five‑satellite positioning (GPS, BeiDou, GLONASS, Galileo, QZSS) to deliver accuracy within 1.5 meters, with a cold start of approximately 38 seconds and a hot start of just 2 seconds for reliable real‑time tracking.
| Size | 1 |
|---|---|
| Pet collar type | Electronic Pet Collars |
| Material | PC+ABS |
| Fastener type | Carabiner |
| Features | Adjustable |
| Color | Orange |
| Brand | WarmFuPalace |
| Pattern | 1 |
| Theme | Pet Collars |
| Occasion | Everyday |
| Animal type | Dog |
| Animal lifestage | All Lifestages |
| Accessories | Pet Collars |
| Has written warranty | No |
| Power type | Battery |
| Retail packaging | Single Piece |
| Count | 1 |
| Character | 1 |
| Character group | 1 |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form